| Assessment Year | 2007 |
|---|---|
| Principal Product | Carbonated and Non-Carbonated Soft Drinks |
| NAICS | 312111: Soft Drink Manufacturing |
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $50 M to 100M |
| # of Employees | 335 |
| Plant Area |
212,578
ft2
|
| Annual Production | 36,000,000
units
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $479,160 | 8,910,215 |
kWh
|
$0.054 |
| Electricity Demand | $262,823 | 21,583 |
kW-mo/yr
|
$12.18 |
| Electricity Fees | $54,745 | - |
|
- |
| Natural Gas | $607,903 | 46,625 |
MMBtu
|
$13.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $205,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $73,559 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.4115: Recover and reuse cooling water | $56,454 | - | - | - |
$22,481
-
MMBtu
|
$33,973
-
Tgal
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $31,763 | - |
$135,309
2,515,968
kWh
|
$49,110
-
kW-mo/yr
|
$(-186,629.0)
-
MMBtu
|
$33,973
-
Tgal
|
|
| 03 | 2.4239: Eliminate or reduce compressed air usage | $28,235 | $20,000 |
$20,720
385,282
kWh
|
$7,515
-
kW-mo/yr
|
- | - | |
| 04 | 3.4157: Replace water cooling on processes with air cooling | $33,973 | $300,000 | - | - | - |
$33,973
-
Tgal
|
|
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $20,590 | - |
$(-716.0)
(-13,319)
kWh
|
$(-223.0)
-
kW-mo/yr
|
$21,529
-
MMBtu
|
- | |
| 06 | 3.4151: Minimize water usage | $15,684 | - | - | - | - |
$15,684
-
Tgal
|
|
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,128 | $2,200 | - | - |
$9,128
-
MMBtu
|
- | |
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $7,015 | - | - | - |
$7,015
-
MMBtu
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,223 | $86,000 |
$1,631
30,326
kWh
|
$592
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $205,065 | $408,200 |
$156,944
2,918,257
kWh
|
$56,994
-
kW-mo/yr
|
$(-126,476.0)
-
MMBtu
|
$117,603
-
Tgal
|
||
| TOTAL IMPLEMENTED | $73,559 | $408,200 |
$22,351
415,608
kWh
|
$8,107
-
kW-mo/yr
|
$9,128
-
MMBtu
|
$33,973
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs