| Assessment Year | 2024 |
|---|---|
| Principal Product | Plastic |
| NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 48 |
| Plant Area |
63,000
ft2
|
| Annual Production | 100,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $97,631 | 1,433,250 |
kWh
|
$0.068 | |
| Electricity Demand | $19,846 | 4,661 |
kW-mo/yr
|
$4.26 | |
| Electricity Fees | $5,831 | - |
|
- | |
| LPG | $2,912 | 161 |
MMBtu
|
$18.09 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,959 | 1,623 |
Tgal
|
$1.21 | |
| TOTAL YEARLY COSTS | $128,179 | ||||
| RECOMMENDED SAVINGS* | $43,249 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $14,238 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $612 | - |
$612
9,000
kWh
|
- | - | |
| 02 | 2.7261: Install timers and/or thermostats | $2,331 | $1,140 |
$2,331
34,277
kWh
|
- | - | |
| 03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $7,934 | $5,000 | - | - |
$7,934
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,259 | $2,600 |
$2,017
29,681
kWh
|
$242
-
kW-mo/yr
|
- | |
| 05 | 2.4226: Use / purchase optimum sized compressor | $22,353 | $55,321 |
$15,122
222,387
kWh
|
$7,231
-
kW-mo/yr
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,634 | $5,000 |
$1,352
19,883
kWh
|
$282
-
kW-mo/yr
|
- | |
| 07 | 2.7135: Install occupancy sensors | $160 | $563 |
$160
2,358
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $430 | $1,950 |
$430
6,318
kWh
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,102 | $5,494 |
$878
12,917
kWh
|
$224
-
kW-mo/yr
|
- | |
| 10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,434 | $30,000 |
$3,957
58,188
kWh
|
$477
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $43,249 | $107,068 |
$26,859
395,009
kWh
|
$8,456
-
kW-mo/yr
|
$7,934
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,238 | $14,234 |
$5,838
85,875
kWh
|
$466
-
kW-mo/yr
|
$7,934
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs