ITAC Assessment: LE0582
ITAC logo
ITAC Assessment: LE0582
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 63,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,631 1,433,250
kWh
Electricity Demand $19,846 4,661
kW-mo/yr
Electricity Fees $5,831 -
LPG $2,912 161
MMBtu
Waste Disposal Costs
Water Usage $1,959 1,623
Tgal
TOTAL YEARLY COSTS $128,179
RECOMMENDED SAVINGS* $43,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $612 - $612
9,000
kWh
- -
02 2.7261: Install timers and/or thermostats $2,331 $1,140 $2,331
34,277
kWh
- -
03 2.2443: Re-use or recycle hot or cold process exhaust air $7,934 $5,000 - - $7,934
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,259 $2,600 $2,017
29,681
kWh
$242
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $22,353 $55,321 $15,122
222,387
kWh
$7,231
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $1,634 $5,000 $1,352
19,883
kWh
$282
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $160 $563 $160
2,358
kWh
- -
08 2.7135: Install occupancy sensors $430 $1,950 $430
6,318
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,102 $5,494 $878
12,917
kWh
$224
-
kW-mo/yr
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,434 $30,000 $3,957
58,188
kWh
$477
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,249 $107,068 $26,859
395,009
kWh
$8,456
-
kW-mo/yr
$7,934
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs