Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

418

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0193 #05 Y:2021 Reduce the pressure of compressed air to the minimum required $1,875 $5,000
UU0193 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,736 $1,307
UU0193 #03 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,764 $4,720
UU0193 #02 Y:2021 Reschedule plant operations or reduce load to avoid peaks $371,933 $40,000
UU0193 #01 Y:2021 Use solar heat to make electricty $269,225 $7,636,800
SF0576 #06 Y:2021 Use or replace with energy efficient substitutes $41,072 $554,541
SF0576 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $6,882 $28,653
SF0576 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $12,261 $17,288
SF0576 #03 Y:2021 Utilize controls to operate equipment only when needed $12,092 $14,612
SF0576 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $2,886 $120
SF0575 #12 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $2,554 $6,764
SF0575 #11 Y:2021 Utilize higher efficiency lamps and/or ballasts $11,353 $19,986
SF0575 #10 Y:2021 Reduce the pressure of compressed air to the minimum required $12,624 $18,284
SF0575 #09 Y:2021 Utilize controls to operate equipment only when needed $1,137 $1,513
SF0575 #08 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $19,559 $16,052
SF0575 #07 Y:2021 Utilize energy-efficient belts and other improved mechanisms $1,748 $1,047
SF0575 #06 Y:2021 Reduce space conditioning during non-working hours $3,311 $966
SF0575 #05 Y:2021 Turn off equipment when not in use $6,642 $1,513
SF0575 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,084 -
AS0482 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,040 $1,459