3,303
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IC0318 #11 Y:2024 | 11 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,250 | $1,159 | |
IC0318 #08 Y:2024 | 08 | 2024 | Eliminate or reduce compressed air usage | $688 | $63 | |
IC0318 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $2,756 | $391 | |
IC0318 #05 Y:2024 | 05 | 2024 | Turn off equipment during breaks, reduce operating time | $6,255 | $8,951 | |
IC0317 #13 Y:2024 | 13 | 2024 | Insulate bare equipment | $2,154 | $4,516 | |
IC0317 #12 Y:2024 | 12 | 2024 | Install smaller boiler (increase high fire duty cycle) | $11,344 | $21,200 | |
IC0317 #11 Y:2024 | 11 | 2024 | Install occupancy sensors | $151 | $425 | |
IC0317 #09 Y:2024 | 09 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $972 | $2,234 | |
IC0317 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $704 | - | |
IC0317 #05 Y:2024 | 05 | 2024 | Eliminate or reduce compressed air usage | $2,337 | $108 | |
IC0317 #03 Y:2024 | 03 | 2024 | Recharge batteries on during off-peak demand periods | $930 | - | |
IC0317 #02 Y:2024 | 02 | 2024 | Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $10,127 | $7,240 | |
IC0316 #11 Y:2024 | 11 | 2024 | Recharge batteries on during off-peak demand periods | $2,060 | - | |
IC0316 #10 Y:2024 | 10 | 2024 | Utilize higher efficiency lamps and/or ballasts | $525 | $205 | |
IC0316 #08 Y:2024 | 08 | 2024 | Replace hydraulic / pneumatic equipment with electric equipment | $2,349 | $3,386 | |
IC0316 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $198 | $144 | |
IC0316 #05 Y:2024 | 05 | 2024 | Eliminate or reduce compressed air usage | $1,039 | $346 | |
IC0316 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,450 | $3,794 | |
IC0316 #03 Y:2024 | 03 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $93 | $379 | |
IC0316 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $9,822 | $728 |