Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,303

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0318 #11 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,250 $1,159
IC0318 #08 Y:2024 Eliminate or reduce compressed air usage $688 $63
IC0318 #07 Y:2024 Install occupancy sensors $2,756 $391
IC0318 #05 Y:2024 Turn off equipment during breaks, reduce operating time $6,255 $8,951
IC0317 #13 Y:2024 Insulate bare equipment $2,154 $4,516
IC0317 #12 Y:2024 Install smaller boiler (increase high fire duty cycle) $11,344 $21,200
IC0317 #11 Y:2024 Install occupancy sensors $151 $425
IC0317 #09 Y:2024 Utilize energy-efficient belts and other improved mechanisms $972 $2,234
IC0317 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $704 -
IC0317 #05 Y:2024 Eliminate or reduce compressed air usage $2,337 $108
IC0317 #03 Y:2024 Recharge batteries on during off-peak demand periods $930 -
IC0317 #02 Y:2024 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $10,127 $7,240
IC0316 #11 Y:2024 Recharge batteries on during off-peak demand periods $2,060 -
IC0316 #10 Y:2024 Utilize higher efficiency lamps and/or ballasts $525 $205
IC0316 #08 Y:2024 Replace hydraulic / pneumatic equipment with electric equipment $2,349 $3,386
IC0316 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $198 $144
IC0316 #05 Y:2024 Eliminate or reduce compressed air usage $1,039 $346
IC0316 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $12,450 $3,794
IC0316 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $93 $379
IC0316 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,822 $728