Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,666

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0582 #05 Y:2024 Install heat pipes / raise cooling setpoint $1,154 $80
AS0582 #03 Y:2024 Replace fossil fuel equipment with electrical equipment $8,400 $204,000
AS0582 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $16,181 $26,757
AS0582 #01 Y:2024 Use solar heat to make electricty $27,124 $186,339
AS0581 #06 Y:2024 Use computer programs to optimize hvac performance $80 $178
AS0581 #04 Y:2024 Install occupancy sensors $1,195 $514
AS0581 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $8,885 $8,703
AS0576 #08 Y:2024 Install heat pipes / raise cooling setpoint $138 $90
AS0576 #07 Y:2024 Use computer programs to optimize hvac performance $562 $2,900
AS0576 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $872 $1,035
AS0576 #05 Y:2024 Install timers on light switches in little used areas $886 $700
AS0576 #03 Y:2024 Begin a practice of predictive / preventative maintenance $3,250 $1,245
AS0576 #01 Y:2024 Use solar heat to make electricty $188,394 $1,306,404
AS0571 #06 Y:2024 Use power during off-peak periods $492 $511
AS0571 #05 Y:2024 Utilize energy-efficient belts and other improved mechanisms $5,292 $908
AS0571 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $16,525 $34,427
AS0571 #03 Y:2024 Pay bills on time to avoid late fees $22,882 $38
AS0571 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $81,526 $55,952
AS0572 #07 Y:2024 Install timers on light switches in little used areas $258 $79
AS0572 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,321 $1,387