ITAC Assessment: AS0579
ITAC logo
ITAC Assessment: AS0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Nutraceuticals
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 130,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 2,540
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,016 1,504,143
kWh
Electricity Demand $28,096 8,666
kW-mo/yr
Electricity Fees $13,162 -
Waste Disposal Costs
Water Usage $8,635 737
Tgal
TOTAL YEARLY COSTS $177,909
RECOMMENDED SAVINGS* $114,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $104,223 $783,210 $81,549
958,273
kWh
$22,674
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $5,355 $861 $4,958
58,262
kWh
$397
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,091 $2,514 $3,467
40,739
kWh
$624
-
kW-mo/yr
-
04 2.6211: Conserve energy by efficient use of vending machines $878 $473 $822
9,665
kWh
$56
-
kW-mo/yr
-
05 2.7423: Reduce heat gain by window tinting $166 $566 $145
1,708
kWh
$21
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $144 $350 $137
1,604
kWh
$7
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $135 $217 $105
1,237
kWh
$19
-
kW-mo/yr
$11
TOTAL RECOMMENDED $114,992 $788,191 $91,183
1,071,488
kWh
$23,798
-
kW-mo/yr
$11
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs