ITAC Assessment: NC0046
ITAC logo
ITAC Assessment: NC0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Ladies Hosiery
NAICS
n/a
SIC 2251: Women's Full-Length and Knee-Length Hosiery, Except Socks
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 26,470
ft2
Annual Production 20,400,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,933 4,147,421
kWh
Natural Gas $32,490 6,340
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,258 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $251 $330 $251
4,689
kWh
-
02 2.4133: Use most efficient type of electric motors $3,179 $6,550 $3,179
57,737
kWh
-
03 2.2612: Use cooling tower water instead of refrigeration $13,396 $12,000 $13,396
179,953
kWh
-
04 2.3113: Make ice during off peak hours for cooling $18,043 $36,000 $18,043
179,953
kWh
-
05 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $605 $550 $605
11,137
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $784 $600 - $784
-
MMBtu
TOTAL RECOMMENDED $36,258 $56,030 $35,474
433,469
kWh
$784
-
MMBtu
TOTAL IMPLEMENTED $4,819 $8,030 $4,035
73,563
kWh
$784
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs