Assessment Year | 2002 |
---|---|
Principal Product | Aluminum Castings |
NAICS |
n/a
|
SIC | 3365: Aluminum Foundries |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
60,000
ft2
|
Annual Production | 1,050,000
lb
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,852 | 1,311,840 |
kWh
|
$0.075 |
Electricity Fees | $1,224 | - |
|
- |
Natural Gas | $30,239 | 40,986 |
MMBtu
|
$0.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,108 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,885 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $25,075 | $56,000 |
$44,964
596,333
kWh
|
$(-19,889.0)
-
MMBtu
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,340 | $1,500 |
$16,340
216,692
kWh
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $4,744 | $1,500 | - |
$4,744
-
MMBtu
|
- | - | |
04 | 2.7231: Use radiant heater for spot heating | $2,178 | $3,000 | - |
$2,178
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,881 | $3,000 |
$1,881
25,212
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $555 | - |
$555
7,356
kWh
|
- | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $529 | $900 |
$529
7,016
kWh
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $365 | $4,000 |
$365
4,841
kWh
|
- | - | - | |
09 | 4.521: Clear and rent existing space | $5,076 | $1,000 | - | - | $5,076 | - | |
10 | 4.447: Automate payroll system | $1,365 | $2,500 | - | - | - | $1,365 | |
TOTAL RECOMMENDED | $58,108 | $73,400 |
$64,634
857,450
kWh
|
$(-12,967.0)
-
MMBtu
|
$5,076 | $1,365 | ||
TOTAL IMPLEMENTED | $23,885 | $10,000 |
$19,141
254,101
kWh
|
$4,744
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs