Assessment Year | 2024 |
---|---|
Principal Product | Education |
NAICS | 611110: Elementary and Secondary Schools |
SIC | 8211: Elementary and Secondary Schools |
Sales Range | less than $500 k |
# of Employees | 75 |
Plant Area |
92,600
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 2,490
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $94,913 | 1,025,299 |
kWh
|
$0.093 |
Electricity Demand | $52,276 | 4,553 |
kW-mo/yr
|
$11.48 |
Electricity Fees | $15,248 | - |
|
- |
Natural Gas | $84,637 | 9,990 |
MMBtu
|
$8.47 |
Fuel Oil #1 | $66,444 | 2,140 |
MMBtu
|
$31.05 |
TOTAL YEARLY COSTS | $313,518 | |||
RECOMMENDED SAVINGS* | $58,315 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $27,124 | $186,339 |
$25,138
271,464
kWh
|
$1,986
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,181 | $26,757 |
$10,612
114,604
kWh
|
$4,496
-
kW-mo/yr
|
- | $1,073 | |
03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $8,400 | $204,000 |
$(-3,319.0)
(-34,498)
kWh
|
$(-1,570.0)
-
kW-mo/yr
|
$13,289
-
MMBtu
|
- | |
04 | 2.7132: Install timers on light switches in little used areas | $5,018 | $5,093 |
$5,018
54,189
kWh
|
- | - | - | |
05 | 2.7272: Install heat pipes / raise cooling setpoint | $1,154 | $80 |
$856
9,246
kWh
|
$298
-
kW-mo/yr
|
- | - | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $438 | $498 |
$358
3,868
kWh
|
$80
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $58,315 | $422,767 |
$38,663
418,873
kWh
|
$5,290
-
kW-mo/yr
|
$13,289
-
MMBtu
|
$1,073 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs