ITAC Assessment: AS0582
ITAC logo
ITAC Assessment: AS0582
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Education
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 75
Plant Area 92,600
ft2
Annual Production 1
units
Production Hrs. Annual 2,490
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,913 1,025,299
kWh
Electricity Demand $52,276 4,553
kW-mo/yr
Electricity Fees $15,248 -
Natural Gas $84,637 9,990
MMBtu
Fuel Oil #1 $66,444 2,140
MMBtu
TOTAL YEARLY COSTS $313,518
RECOMMENDED SAVINGS* $58,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $27,124 $186,339 $25,138
271,464
kWh
$1,986
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,181 $26,757 $10,612
114,604
kWh
$4,496
-
kW-mo/yr
- $1,073
03 2.1321: Replace fossil fuel equipment with electrical equipment $8,400 $204,000 $(-3,319.0)
(-34,498)
kWh
$(-1,570.0)
-
kW-mo/yr
$13,289
-
MMBtu
-
04 2.7132: Install timers on light switches in little used areas $5,018 $5,093 $5,018
54,189
kWh
- - -
05 2.7272: Install heat pipes / raise cooling setpoint $1,154 $80 $856
9,246
kWh
$298
-
kW-mo/yr
- -
06 2.6211: Conserve energy by efficient use of vending machines $438 $498 $358
3,868
kWh
$80
-
kW-mo/yr
- -
TOTAL RECOMMENDED $58,315 $422,767 $38,663
418,873
kWh
$5,290
-
kW-mo/yr
$13,289
-
MMBtu
$1,073
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs