| Assessment Year | 1986 |
|---|---|
| Principal Product | RR TRACKWORK PRODUCTS |
| NAICS |
n/a
|
| SIC | 3743: Railroad Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 67 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $135,738 | 2,017,878 |
kWh
|
$0.067 |
| Natural Gas | $77,417 | 15,115 |
MMBtu
|
$5.12 |
| Fuel Oil #2 | $39,169 | 7,000 |
MMBtu
|
$5.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $78,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,891 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $52,010 | $16,000 |
$12,841
234,174
kWh
|
- |
$39,169
-
MMBtu
|
- | |
| 02 | 2.7494: Install storm windows and doors | $12,529 | $16,200 | - |
$12,529
-
MMBtu
|
- | - | |
| 03 | 2.6232: Install set-back timers | $1,589 | - |
$1,558
45,721
kWh
|
$(-169.0)
-
MMBtu
|
- | $200 | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,168 | - |
$3,348
-
kWh
|
- | - | $(-180.0) | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $9,134 | $21,000 | - |
$8,284
-
MMBtu
|
- | $850 | |
| TOTAL RECOMMENDED | $78,430 | $53,200 |
$17,747
279,895
kWh
|
$20,644
-
MMBtu
|
$39,169
-
MMBtu
|
$870 | ||
| TOTAL IMPLEMENTED | $13,891 | $21,000 |
$4,906
45,721
kWh
|
$8,115
-
MMBtu
|
- | $870 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs