ITAC Assessment: NC0203
ITAC logo
ITAC Assessment: NC0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Knitted fabric
NAICS
n/a
SIC 2253: Knit Outerwear Mills
Sales Range $5
M
to 10
M
# of Employees 156
Plant Area 182,640
ft2
Annual Production 7,800,000
pieces
Production Hrs. Annual 7,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,092 5,295,428
kWh
Electricity Demand $89,000 10,815
kW-mo/yr
Electricity Fees $7,419 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,621 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Increase in Production Savings
01 4.121: Maintain clean conditions before painting $5,811 $13,000 - - $(-2,080.0)
-
Tgal
- $7,891
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,627 - $1,164
38,394
kWh
$1,463
-
kW-mo/yr
- - -
03 2.4323: Use optimum size and capacity equipment $24,784 $8,500 $17,219
566,530
kWh
$7,565
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,597 $150 $1,110
35,463
kWh
$487
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $630 $691 $438
14,361
kWh
$192
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,299 $220 $902
29,601
kWh
$397
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,732 $849 $2,421
79,719
kWh
$1,311
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,141 $6,000 $930
30,481
kWh
$511
-
kW-mo/yr
- $2,700 -
TOTAL RECOMMENDED $44,621 $29,410 $24,184
794,549
kWh
$11,926
-
kW-mo/yr
$(-2,080.0)
-
Tgal
$2,700 $7,891
TOTAL IMPLEMENTED $10,665 $13,841 $2,712
88,218
kWh
$2,142
-
kW-mo/yr
$(-2,080.0)
-
Tgal
- $7,891
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs