ITAC Assessment: AS0581
ITAC logo
ITAC Assessment: AS0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Herbicides, Fungicides, and Pesticides
NAICS 325320: Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 345
Plant Area 3,308,382
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 8,472
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,459 8,092,080
kWh
Electricity Demand $336,618 27,011
kW-mo/yr
Electricity Fees $6,095 -
Natural Gas $119,250 10,245
MMBtu
LPG $140,873 6,614
MMBtu
TOTAL YEARLY COSTS $1,099,295
RECOMMENDED SAVINGS* $155,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $114,491 $1,279,371 $(-44,882.0)
(-730,981)
kWh
- $140,873
-
MMBtu
$18,500
02 2.4224: Upgrade controls on compressors $30,471 $40,000 $23,668
385,475
kWh
$6,803
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,885 $8,703 $6,901
112,405
kWh
$1,984
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $1,195 $514 $928
15,119
kWh
$267
-
kW-mo/yr
- -
05 2.7132: Install timers on light switches in little used areas $161 $322 $115
1,880
kWh
$46
-
kW-mo/yr
- -
06 2.7226: Use computer programs to optimize hvac performance $80 $178 $50
809
kWh
$30
-
kW-mo/yr
- -
TOTAL RECOMMENDED $155,283 $1,329,088 $(-13,220.0)
(-215,293)
kWh
$9,130
-
kW-mo/yr
$140,873
-
MMBtu
$18,500
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs