| Assessment Year | 2024 |
|---|---|
| Principal Product | Reclaimed water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 25 |
| Plant Area |
3,390,468
ft2
|
| Annual Production | 16,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,431,896 | 16,649,948 |
kWh
|
$0.086 |
| Electricity Demand | $164,041 | 32,483 |
kW-mo/yr
|
$5.05 |
| Electricity Fees | $137,227 | - |
|
- |
| TOTAL YEARLY COSTS | $1,733,164 | |||
| RECOMMENDED SAVINGS* | $237,020 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $194,102 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $188,394 | $1,306,404 |
$169,850
1,975,005
kWh
|
$18,544
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $39,891 | $18,800 |
$36,028
418,925
kWh
|
$3,863
-
kW-mo/yr
|
- | |
| 03 | 4.611: Begin a practice of predictive / preventative maintenance | $3,250 | $1,245 |
$3,250
37,791
kWh
|
- | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $3,027 | $160 |
$2,178
26,325
kWh
|
$849
-
kW-mo/yr
|
- | |
| 05 | 2.7132: Install timers on light switches in little used areas | $886 | $700 |
$886
10,303
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $872 | $1,035 |
$545
6,342
kWh
|
$53
-
kW-mo/yr
|
$274 | |
| 07 | 2.7226: Use computer programs to optimize hvac performance | $562 | $2,900 |
$562
6,533
kWh
|
- | - | |
| 08 | 2.7272: Install heat pipes / raise cooling setpoint | $138 | $90 |
$130
1,522
kWh
|
$8
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $237,020 | $1,331,334 |
$213,429
2,482,746
kWh
|
$23,317
-
kW-mo/yr
|
$274 | ||
| TOTAL IMPLEMENTED | $194,102 | $1,312,374 |
$175,223
2,037,496
kWh
|
$18,605
-
kW-mo/yr
|
$274 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs