ITAC Assessment: ND0363
ITAC logo
ITAC Assessment: ND0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Tie Rods and Drag Links
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 390
Plant Area 192,000
ft2
Annual Production 2,188,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $406,128 12,651,231
kWh
Electricity Demand $209,070 31,507
kW-mo/yr
Electricity Fees $58,285 -
Natural Gas $146,525 43,188
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,021 $8,040 $446
16,999
kWh
$575
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,260 $520 $7,260
226,260
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $189 $380 $64
2,052
kWh
$18
-
kW-mo/yr
- $107
04 2.7135: Install occupancy sensors $234 $300 $175
5,569
kWh
$59
-
kW-mo/yr
- -
05 2.8123: Pay utility bills on time $1,211 - - - $1,211 -
TOTAL RECOMMENDED $9,915 $9,240 $7,945
250,880
kWh
$652
-
kW-mo/yr
$1,211 $107
TOTAL IMPLEMENTED $9,492 $8,560 $7,706
243,259
kWh
$575
-
kW-mo/yr
$1,211 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs