ITAC Assessment: OR0374
ITAC logo
ITAC Assessment: OR0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wood Pellets
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 0
Plant Area
n/a
Annual Production 57,000
ton
Production Hrs. Annual 6,552
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,230 7,165,544
kWh
Electricity Demand $647 176,244
kW-mo/yr
Electricity Fees $336 -
Natural Gas $153,600 188,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,481

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.5195: Change product design to reduce energy requirements $152,880 $600,000 - - $153,600
-
MMBtu
$(-720.0) - -
02 2.7134: Use photocell controls $2,537 $1,000 $1,973
48,651
kWh
- - - $564 -
03 2.4133: Use most efficient type of electric motors $5,481 $18,298 $4,834
119,285
kWh
$647
-
kW-mo/yr
- - - -
04 3.4111: Use closed cycle process to minimize waste water production $145 $500 $(-80.0)
(-6)
kWh
- - - - $225
-
Tgal
TOTAL RECOMMENDED $161,043 $619,798 $6,727
167,930
kWh
$647
-
kW-mo/yr
$153,600
-
MMBtu
$(-720.0) $564 $225
-
Tgal
TOTAL IMPLEMENTED $5,481 $18,298 $4,834
119,285
kWh
$647
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs