ITAC Assessment: UL0117
ITAC logo
ITAC Assessment: UL0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Denim Blue Jeans
NAICS
n/a
SIC 2263:
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 25,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 8,064
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,865 4,072,978
kWh
Natural Gas $15,750 3,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4221: Install compressor air intakes in coolest locations $149 $25 $149
2,931
kWh
- - -
02 2.4133: Use most efficient type of electric motors $4,441 $22,850 $4,441
86,460
kWh
- - -
03 2.3212: Optimize plant power factor $1,046 $808 $1,046
-
kWh
- - -
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,593 $1,146 - $1,593
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,993 $2,077 $1,993
38,980
kWh
- - -
06 3.4155: Meter waste water $8,000 $1,000 - - $8,000
-
Tgal
-
07 3.4113: Treat and reuse rinse waters $70,000 $8,000 - - $70,000
-
Tgal
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,100 $5,000 - - - $3,100
-
lb
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,660 $1,000 - - $1,660
-
Tgal
-
10 3.6113: Remove sludge from tanks on a regular basis $3,600 $5,000 - - $3,600
-
Tgal
-
TOTAL RECOMMENDED $95,582 $46,906 $7,629
128,371
kWh
$1,593
-
MMBtu
$83,260
-
Tgal
$3,100
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs