ITAC Assessment: HO0140
ITAC logo
ITAC Assessment: HO0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product TEXTILE DYEING
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 56,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,339 535,170
kWh
Electricity Fees $5,906 -
Natural Gas $312,609 61,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,920 $7,836 $3,920
31,653
kWh
- - -
02 2.4133: Use most efficient type of electric motors $3,058 $9,780 $3,058
24,619
kWh
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $10,610 $3,411 - $10,610
-
MMBtu
- -
04 3.4113: Treat and reuse rinse waters $79,100 $300,000 - - $79,100
-
Tgal
-
05 3.4151: Minimize water usage $7,910 $2,000 - - $7,910
-
Tgal
-
06 4.632: Change operating conditions $25,000 - - - - $25,000
TOTAL RECOMMENDED $129,598 $323,027 $6,978
56,272
kWh
$10,610
-
MMBtu
$87,010
-
Tgal
$25,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs