| Assessment Year | 1990 |
|---|---|
| Principal Product | CUSTOM PROFILE EXTRUSION |
| NAICS |
n/a
|
| SIC | 3082: Unsupported Plastics Profile Shapes |
| Sales Range | $5 M to 10M |
| # of Employees | 71 |
| Plant Area |
n/a
|
| Annual Production | 3,283,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $118,072 | 1,626,026 |
kWh
|
$0.073 |
| Fuel Oil #2 | $18,689 | 2,570 |
MMBtu
|
$7.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,412 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $9,738 | $10,200 |
$9,738
-
kWh
|
- | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,358 | - |
$3,358
-
kWh
|
- | |
| 03 | 2.6121: Reduce hot water temperature to the minimum required | $334 | $180 | - |
$334
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $340 | $471 |
$340
4,689
kWh
|
- | |
| TOTAL RECOMMENDED | $13,770 | $10,851 |
$13,436
4,689
kWh
|
$334
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,412 | $10,851 |
$10,078
4,689
kWh
|
$334
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs