Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

637

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2405 #02 Y:2024 Maintain air filters by cleaning or replacement $4,277 $12,000
UW2405 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $16,834 $25,000
UW2404 #05 Y:2024 Use or replace with energy efficient substitutes $15,990 $112,500
UW2404 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $28,693 $75,000
UW2404 #03 Y:2024 Use solar heat to make electricty $114,442 $742,868
UW2404 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $34,140 $25,000
UW2404 #01 Y:2024 Optimize plant power factor $141,402 $150,381
UW2403 #08 Y:2024 Use / purchase optimum sized compressor $24,078 $36,400
UW2403 #07 Y:2024 Use radiant heater for spot heating $8,794 $58,500
UW2403 #06 Y:2024 Upgrade obsolete equipment $6,846 $30,000
UW2403 #05 Y:2024 Install timers and/or thermostats $1,319 $720
UW2403 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,988 $1,080
UW2403 #03 Y:2024 Level two – install control system using iiot devices with communication capabilities to store data to the cloud $222,893 $500,000
UW2403 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $3,147 $4,257
UW2403 #01 Y:2024 Insulate bare equipment $8,480 $4,010
UW2402 #08 Y:2024 Use solar heat to make electricty $49,076 $311,400
UW2402 #07 Y:2024 Use solar heat to heat water $13,327 $84,652
UW2402 #06 Y:2024 Install timers and/or thermostats $17,310 $375
UW2402 #05 Y:2024 Use other waste concentration methods $25,000 $104,000
UW2402 #04 Y:2024 Install shelves / racks to utilize unused space $55,000 $117,000