ITAC Assessment: UW2404
ITAC logo
ITAC Assessment: UW2404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Other concrete product manufacturing
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 184,751
ft2
Annual Production 26,426,835
lb
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,343,674 17,980,800
kWh
Electricity Demand $427,207 34,850
kW-mo/yr
Electricity Fees $216,074 -
Natural Gas $2,366 152
MMBtu
TOTAL YEARLY COSTS $1,989,321
RECOMMENDED SAVINGS* $334,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $141,402 $150,381 - $125,294
-
kW-mo/yr
$16,108
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $34,140 $25,000 $27,876
373,176
kWh
$6,264
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $114,442 $742,868 $112,334
1,503,800
kWh
$2,108
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,693 $75,000 $23,422
313,552
kWh
$5,271
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $15,990 $112,500 $4,700
62,919
kWh
$11,290
-
kW-mo/yr
-
TOTAL RECOMMENDED $334,667 $1,105,749 $168,332
2,253,447
kWh
$150,227
-
kW-mo/yr
$16,108
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs