Assessment Year | 2024 |
---|---|
Principal Product | Other concrete product manufacturing |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $50 M to 100M |
# of Employees | 170 |
Plant Area |
184,751
ft2
|
Annual Production | 26,426,835
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,343,674 | 17,980,800 |
kWh
|
$0.075 |
Electricity Demand | $427,207 | 34,850 |
kW-mo/yr
|
$12.26 |
Electricity Fees | $216,074 | - |
|
- |
Natural Gas | $2,366 | 152 |
MMBtu
|
$15.57 |
TOTAL YEARLY COSTS | $1,989,321 | |||
RECOMMENDED SAVINGS* | $334,667 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $141,402 | $150,381 | - |
$125,294
-
kW-mo/yr
|
$16,108 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $34,140 | $25,000 |
$27,876
373,176
kWh
|
$6,264
-
kW-mo/yr
|
- | |
03 | 2.9114: Use solar heat to make electricty | $114,442 | $742,868 |
$112,334
1,503,800
kWh
|
$2,108
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,693 | $75,000 |
$23,422
313,552
kWh
|
$5,271
-
kW-mo/yr
|
- | |
05 | 2.4322: Use or replace with energy efficient substitutes | $15,990 | $112,500 |
$4,700
62,919
kWh
|
$11,290
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $334,667 | $1,105,749 |
$168,332
2,253,447
kWh
|
$150,227
-
kW-mo/yr
|
$16,108 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs