Assessment Year | 1992 |
---|---|
Principal Product | POWER SYSTEMS/GENERATORS |
NAICS |
n/a
|
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 2,000
pieces
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,111 | 1,071,219 |
kWh
|
$0.090 |
Natural Gas | $14,316 | 2,232 |
MMBtu
|
$6.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,541 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,799 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $130 | $900 |
$130
1,465
kWh
|
- | - | |
02 | 2.6218: Turn off equipment when not in use | $710 | $120 |
$710
7,913
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,866 | $2,000 |
$16,866
187,866
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $582 | $45 |
$582
6,448
kWh
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $4,093 | $4,450 | - |
$4,093
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $338 | $77 | - |
$338
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $785 | $925 |
$447
4,982
kWh
|
- | $338 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,781 | $1,200 |
$1,781
17,292
kWh
|
- | - | |
09 | 2.6232: Install set-back timers | $2,785 | $3,240 |
$2,785
27,257
kWh
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,471 | $1,980 |
$1,471
23,447
kWh
|
- | - | |
TOTAL RECOMMENDED | $29,541 | $14,937 |
$24,772
276,670
kWh
|
$4,431
-
MMBtu
|
$338 | ||
TOTAL IMPLEMENTED | $21,799 | $7,470 |
$17,706
197,244
kWh
|
$4,093
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs