ITAC Assessment: SU0309
ITAC logo
ITAC Assessment: SU0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Precision Ground Gears
NAICS 332710: Machine Shops
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 45,000
ft2
Annual Production 176,153
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,160 1,398,600
kWh
Electricity Demand $17,418 4,355
kW-mo/yr
Natural Gas $5,165 487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,082

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $201 - $201
6,270
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $255 $147 $255
7,980
kWh
- -
03 2.7135: Install occupancy sensors $272 $570 $272
8,500
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $220 $549 $220
6,878
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $68 $228 $45
1,402
kWh
$8
-
kW-mo/yr
$15
06 2.6211: Conserve energy by efficient use of vending machines $68 $287 $68
2,113
kWh
- -
07 2.4321: Upgrade obsolete equipment $116 $1,258 $84
2,640
kWh
$32
-
kW-mo/yr
-
08 2.4321: Upgrade obsolete equipment $1,442 $16,500 $1,338
41,800
kWh
$104
-
kW-mo/yr
-
TOTAL RECOMMENDED $2,642 $19,539 $2,483
77,583
kWh
$144
-
kW-mo/yr
$15
TOTAL IMPLEMENTED $2,082 $18,133 $1,923
60,092
kWh
$144
-
kW-mo/yr
$15
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs