Assessment Year | 2024 |
---|---|
Principal Product | Pharmaceutical Preparation Manufacturing |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 81 |
Plant Area |
108,300
ft2
|
Annual Production | 72
units
|
Production Hrs. Annual | 6,387
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $267,097 | 3,760,163 |
kWh
|
$0.071 |
Electricity Demand | $38,084 | 7,757 |
kW-mo/yr
|
$4.91 |
Electricity Fees | $32,674 | - |
|
- |
Natural Gas | $57,672 | 4,191 |
MMBtu
|
$13.76 |
TOTAL YEARLY COSTS | $395,527 | |||
RECOMMENDED SAVINGS* | $177,482 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $177,200 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,442 | $5,083 |
$14,106
198,677
kWh
|
$1,336
-
kW-mo/yr
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,045 | $582 |
$1,868
26,306
kWh
|
$177
-
kW-mo/yr
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $282 | $1,742 |
$258
3,630
kWh
|
$24
-
kW-mo/yr
|
- | - | - | |
04 | 4.515: Install shelves / racks to utilize unused space | $55,000 | $117,000 | - | - | - | - | $55,000 | |
05 | 3.3133: Use other waste concentration methods | $25,000 | $104,000 | - | - | - | $25,000 | - | |
06 | 2.7261: Install timers and/or thermostats | $17,310 | $375 | - | - |
$17,310
-
MMBtu
|
- | - | |
07 | 2.9112: Use solar heat to heat water | $13,327 | $84,652 |
$12,173
171,462
kWh
|
$1,154
-
kW-mo/yr
|
- | - | - | |
08 | 2.9114: Use solar heat to make electricty | $49,076 | $311,400 |
$44,828
631,386
kWh
|
$4,248
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $177,482 | $624,834 |
$73,233
1,031,461
kWh
|
$6,939
-
kW-mo/yr
|
$17,310
-
MMBtu
|
$25,000 | $55,000 | ||
TOTAL IMPLEMENTED | $177,200 | $623,092 |
$72,975
1,027,831
kWh
|
$6,915
-
kW-mo/yr
|
$17,310
-
MMBtu
|
$25,000 | $55,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs