ITAC Assessment: UW2405
ITAC logo
ITAC Assessment: UW2405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Other Aircraft Parts and Auxiliary Equipment Manufacturing
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 334
Plant Area 79,000
ft2
Annual Production 2,500
ton
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,319 2,569,289
kWh
Electricity Demand $60,964 6,024
kW-mo/yr
Electricity Fees $39,292 -
Natural Gas $104,262 9,905
MMBtu
TOTAL YEARLY COSTS $401,837
RECOMMENDED SAVINGS* $195,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,834 $25,000 $14,263
185,712
kWh
$2,571
-
kW-mo/yr
- -
02 2.6127: Maintain air filters by cleaning or replacement $4,277 $12,000 $3,623
47,178
kWh
$654
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $24,745 $24,732 - - $24,745
-
MMBtu
-
04 4.432: Cross-train personnel to avoid lost time $150,000 $200,000 - - - $150,000
TOTAL RECOMMENDED $195,856 $261,732 $17,886
232,890
kWh
$3,225
-
kW-mo/yr
$24,745
-
MMBtu
$150,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs