ITAC Assessment: UW2403
ITAC logo
ITAC Assessment: UW2403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Unlaminated Plastics Film and Sheet (except Packaging)
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 14,910
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,486,336 21,629,600
kWh
Electricity Demand $311,058 47,158
kW-mo/yr
Electricity Fees $473 -
Natural Gas $247,773 28,154
MMBtu
TOTAL YEARLY COSTS $2,045,640
RECOMMENDED SAVINGS* $293,545 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $8,480 $4,010 - - $8,480
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,147 $4,257 $2,781
40,472
kWh
$366
-
kW-mo/yr
-
03 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud $222,893 $500,000 $222,893
3,244,440
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,988 $1,080 $15,186
221,040
kWh
$2,802
-
kW-mo/yr
-
05 2.7261: Install timers and/or thermostats $1,319 $720 $1,319
19,200
kWh
- -
06 2.4321: Upgrade obsolete equipment $6,846 $30,000 - - $6,846
-
MMBtu
07 2.7231: Use radiant heater for spot heating $8,794 $58,500 $8,794
128,000
kWh
- -
08 2.4226: Use / purchase optimum sized compressor $24,078 $36,400 $19,421
282,694
kWh
$4,657
-
kW-mo/yr
-
TOTAL RECOMMENDED $293,545 $634,967 $270,394
3,935,846
kWh
$7,825
-
kW-mo/yr
$15,326
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs