Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

608

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2518 #06 Y:2025 Use or replace with energy efficient substitutes $18,560 $100,800
UW2518 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,286 $28,047
UW2518 #04 Y:2025 Use photocell controls $795 $1,729
UW2518 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $13,675 $64,800
UW2518 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $59,635 $40,500
UW2518 #01 Y:2025 Install back-up equipment $172,619 $196,087
UW2517 #03 Y:2025 Repair and eliminate steam leaks $4,812 $3,250
UW2517 #02 Y:2025 Insulate glazing, walls, ceilings, and roofs $80,006 $297,653
UW2517 #01 Y:2025 Install / repair insulation on steam lines $1,400 $1,080
UW2516 #04 Y:2025 Optimize plant power factor $15,521 $30,555
UW2516 #03 Y:2025 Optimize production lot sizes and inventories $884,000 $1,200,000
UW2516 #02 Y:2025 Use most efficient type of electric motors $22,966 $71,500
UW2516 #01 Y:2025 Use demand controller or load shedder $64,296 $986,160
UW2515 #04 Y:2025 Use battery storage for demand control $20,506 $17,192
UW2515 #03 Y:2025 Install occupancy sensors $2,230 $1,712
UW2515 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,985 $5,850
UW2515 #01 Y:2025 Use most efficient type of electric motors $8,499 $27,909
UW2514 #04 Y:2025 Use / purchase optimum sized compressor $7,983 $32,480
UW2514 #03 Y:2025 Install occupancy sensors $1,640 $7,378
UW2514 #02 Y:2025 Replace boiler $55,958 $93,719