ITAC Assessment: UW2606
ITAC logo
ITAC Assessment: UW2606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Ready Mix Concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $5
M
to 10
M
# of Employees 23
Plant Area 11,254
ft2
Annual Production 45,000
units
Production Hrs. Annual 3,432
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,647 296,034
kWh
Electricity Demand $83,798 1,512
kW-mo/yr
Electricity Fees $3,330 -
Natural Gas $61,892 5,220
MMBtu
Other Gas $175 1
MMBtu
TOTAL YEARLY COSTS $181,842
RECOMMENDED SAVINGS* $29,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $889 $4,166 $775
7,029
kWh
$114
-
kW-mo/yr
-
02 2.7492: Use proper thickness of insulation on building envelope $2,869 $7,446 - - $2,869
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $742 $5,000 $426
3,860
kWh
$316
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,667 $22,869 - - $3,667
-
MMBtu
05 2.3141: Use battery storage for demand control $20,950 $12,248 - $20,950
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,117 $51,729 $1,201
10,889
kWh
$21,380
-
kW-mo/yr
$6,536
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs