| Assessment Year | 2026 |
|---|---|
| Principal Product | Ready Mix Concrete |
| NAICS | 327320: Ready-Mix Concrete Manufacturing |
| SIC | 3273: Ready-Mixed Concrete |
| Sales Range | $5 M to 10M |
| # of Employees | 23 |
| Plant Area |
11,254
ft2
|
| Annual Production | 45,000
units
|
| Production Hrs. Annual | 3,432
hrs
|
| Location (State) | Alaska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $32,647 | 296,034 |
kWh
|
$0.11 |
| Electricity Demand | $83,798 | 1,512 |
kW-mo/yr
|
$55.42 |
| Electricity Fees | $3,330 | - |
|
- |
| Natural Gas | $61,892 | 5,220 |
MMBtu
|
$11.86 |
| Other Gas | $175 | 1 |
MMBtu
|
$175.00 |
| TOTAL YEARLY COSTS | $181,842 | |||
| RECOMMENDED SAVINGS* | $29,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $889 | $4,166 |
$775
7,029
kWh
|
$114
-
kW-mo/yr
|
- | |
| 02 | 2.7492: Use proper thickness of insulation on building envelope | $2,869 | $7,446 | - | - |
$2,869
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $742 | $5,000 |
$426
3,860
kWh
|
$316
-
kW-mo/yr
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,667 | $22,869 | - | - |
$3,667
-
MMBtu
|
|
| 05 | 2.3141: Use battery storage for demand control | $20,950 | $12,248 | - |
$20,950
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $29,117 | $51,729 |
$1,201
10,889
kWh
|
$21,380
-
kW-mo/yr
|
$6,536
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs