ITAC Assessment: UW2607
ITAC logo
ITAC Assessment: UW2607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Tie Rods/Struts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 119
Plant Area 110,000
ft2
Annual Production 181,000
pieces
Production Hrs. Annual 7,072
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,282 2,000,000
kWh
Electricity Demand $27,397 3,915
kW-mo/yr
Electricity Fees $17,321 -
Natural Gas $64,504 7,000
MMBtu
Other Gas $5,496 1
MMBtu
TOTAL YEARLY COSTS $290,000
RECOMMENDED SAVINGS* $15,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4226: Use / purchase optimum sized compressor $5,694 $55,158 $5,005
57,138
kWh
$689
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,097 $13,445 $1,843
21,043
kWh
$254
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $6,789 $3,326 $6,789
77,501
kWh
- -
04 2.3212: Optimize plant power factor $1,034 $3,395 - - $1,034
TOTAL RECOMMENDED $15,614 $75,324 $13,637
155,682
kWh
$943
-
kW-mo/yr
$1,034
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs