| Assessment Year | 1990 |
|---|---|
| Principal Product | POULTRY FEED AND EGGS |
| NAICS |
n/a
|
| SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
n/a
|
| Annual Production | 1,140,000
ton
|
| Production Hrs. Annual | 6,188
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,313 | 2,090,270 |
kWh
|
$0.058 |
| LPG | $17,115 | 2,831 |
MMBtu
|
$6.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,883 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $40,883 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,570 | $14,040 |
$30,570
695,193
kWh
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,960 | $2,000 |
$3,960
116,061
kWh
|
|
| 03 | 2.2711: Utilize outside air instead of conditioned air for drying | $2,910 | $4,800 |
$2,910
77,081
kWh
|
|
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,720 | - |
$1,720
-
kWh
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $691 | $698 |
$691
12,016
kWh
|
|
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $422 | - |
$422
12,896
kWh
|
|
| 07 | 2.3132: Recharge batteries on during off-peak demand periods | $330 | - |
$330
-
kWh
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $170 | $180 |
$170
3,224
kWh
|
|
| 09 | 2.4312: Improve lubrication practices | $110 | - |
$110
3,224
kWh
|
|
| TOTAL RECOMMENDED | $40,883 | $21,718 |
$40,883
919,695
kWh
|
||
| TOTAL IMPLEMENTED | $40,883 | $21,718 |
$40,883
919,695
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs