ITAC Assessment: AM0352
ITAC logo
ITAC Assessment: AM0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fracturing units, blenders, coiled tubing units, data vans,
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 122,000
ft2
Annual Production 73
pieces
Production Hrs. Annual 3,040
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,873 2,112,544
kWh
Electricity Demand $16,960 5,591
kW-mo/yr
Electricity Fees $8,175 -
Natural Gas $20,993 3,599
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $26,500 $16,000 - $26,500
-
kW-mo/yr
- - - -
02 2.8121: Apply for tax-free status for energy purchases $10,800 $7,200 - - $10,800 - - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,430 $500 - - - $2,430
-
lb
- -
04 2.7131: Add area lighting switches $1,920 $310 $650
23,447
kWh
$1,270
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,650 $650 $125
4,396
kWh
$85
-
kW-mo/yr
- - $1,440 -
06 2.7131: Add area lighting switches $1,240 $150 $390
14,654
kWh
$850
-
kW-mo/yr
- - - -
07 2.8123: Pay utility bills on time $274 - - - - - - $274
08 2.7124: Make a practice of turning off lights when not needed $255 - $60
2,052
kWh
$195
-
kW-mo/yr
- - - -
09 2.7124: Make a practice of turning off lights when not needed $140 - $40
1,465
kWh
$100
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $45,209 $24,810 $1,265
46,014
kWh
$29,000
-
kW-mo/yr
$10,800 $2,430
-
lb
$1,440 $274
TOTAL IMPLEMENTED $11,329 $7,200 $60
2,052
kWh
$195
-
kW-mo/yr
$10,800 - - $274
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs