Assessment Year | 1992 |
---|---|
Principal Product | FARM IMPLEMENTS |
NAICS |
n/a
|
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
n/a
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 6,656
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,779 | 3,395,956 |
kWh
|
$0.048 |
Natural Gas | $33,554 | 7,961 |
MMBtu
|
$4.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,033 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,878 | $17,000 |
$20,498
423,505
kWh
|
$(-7,620.0)
-
MMBtu
|
- | |
02 | 2.7261: Install timers and/or thermostats | $2,727 | $1,000 |
$1,178
24,326
kWh
|
$1,549
-
MMBtu
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $286 | $1,030 | - |
$286
-
MMBtu
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $346 | $371 | - |
$346
-
MMBtu
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $704 | $6,500 |
$704
14,654
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,441 | $100 |
$2,441
50,410
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $403 | $811 |
$403
16,706
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $811 | $126 |
$937
19,343
kWh
|
- | $(-126.0) | |
09 | 2.6232: Install set-back timers | $941 | $400 |
$941
19,343
kWh
|
- | - | |
TOTAL RECOMMENDED | $21,537 | $27,338 |
$27,102
568,287
kWh
|
$(-5,439.0)
-
MMBtu
|
$(-126.0) | ||
TOTAL IMPLEMENTED | $15,033 | $18,337 |
$22,779
478,897
kWh
|
$(-7,620.0)
-
MMBtu
|
$(-126.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs