ITAC Assessment: GT0146
ITAC logo
ITAC Assessment: GT0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MAGNET WIRE
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area
n/a
Annual Production 9,000,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,722 7,878,957
kWh
Natural Gas $131,729 33,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,459 - $8,459
-
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,881 $5,192 $3,881
99,648
kWh
03 2.4133: Use most efficient type of electric motors $3,301 $3,296 $3,301
84,994
kWh
TOTAL RECOMMENDED $15,641 $8,488 $15,641
184,642
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs