| Assessment Year | 1996 |
|---|---|
| Principal Product | Aluminum Extrusions |
| NAICS |
n/a
|
| SIC | 3334: Primary Production of Aluminum |
| Sales Range | $10 M to 50M |
| # of Employees | 169 |
| Plant Area |
200,000
ft2
|
| Annual Production | 18,000,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $383,443 | 7,648,593 |
kWh
|
$0.050 |
| Electricity Demand | $43,923 | 20,333 |
kW-mo/yr
|
$2.16 |
| Natural Gas | $591,304 | 162,342 |
MMBtu
|
$3.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,356 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,410 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $981 | $1,097 |
$886
15,826
kWh
|
$95
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,872 | $3,120 |
$1,691
30,481
kWh
|
$181
-
kW-mo/yr
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,350 | - |
$1,257
22,567
kWh
|
$93
-
kW-mo/yr
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $10,105 | $19,207 |
$9,425
169,402
kWh
|
$680
-
kW-mo/yr
|
- | |
| 05 | 2.4314: Use synthetic lubricant | $1,102 | $460 |
$996
17,878
kWh
|
$106
-
kW-mo/yr
|
- | |
| 06 | 3.1242: Allow drainage before withdrawing object | $1,946 | - | - | - |
$1,946
-
gal
|
|
| TOTAL RECOMMENDED | $17,356 | $23,884 |
$14,255
256,154
kWh
|
$1,155
-
kW-mo/yr
|
$1,946
-
gal
|
||
| TOTAL IMPLEMENTED | $15,410 | $23,884 |
$14,255
256,154
kWh
|
$1,155
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs