Assessment Year | 1999 |
---|---|
Principal Product | Skin and hair care products |
NAICS |
n/a
|
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $50 M to 100M |
# of Employees | 240 |
Plant Area |
155,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 2,314
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $132,849 | 3,697,245 |
kWh
|
$0.036 |
Electricity Demand | $80,407 | 9,772 |
kW-mo/yr
|
$8.23 |
Electricity Fees | $1,499 | - |
|
- |
Natural Gas | $24,267 | 5,833 |
MMBtu
|
$4.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $760,518 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $682,458 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.441: Install automatic packing equipment | $675,000 | $51,000 | - | - | - | - | - | - | - | $675,000 | |
02 | 4.441: Install automatic packing equipment | $76,360 | $175,000 | - | - | - | - | - | - | $76,360 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,540 | $300 |
$2,540
97,597
kWh
|
- | - | - | - | - | - | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,700 | - | - |
$1,700
-
kW-mo/yr
|
- | - | - | - | - | - | |
05 | 4.821: Pay bills on time to avoid late fees | $1,213 | - | - | - | - | - | - | $1,213 | - | - | |
06 | 2.2511: Insulate bare equipment | $980 | $1,840 | - | - |
$980
-
MMBtu
|
- | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $845 | $850 |
$190
7,327
kWh
|
$125
-
kW-mo/yr
|
- | - | $530 | - | - | - | |
08 | 2.2511: Insulate bare equipment | $830 | $180 | - | - |
$830
-
MMBtu
|
- | - | - | - | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $770 | $500 | - | - |
$770
-
MMBtu
|
- | - | - | - | - | |
10 | 3.4154: Eliminate leaks in water lines and valves | $280 | $36 | - | - | - |
$280
-
Tgal
|
- | - | - | - | |
TOTAL RECOMMENDED | $760,518 | $229,706 |
$2,730
104,924
kWh
|
$1,825
-
kW-mo/yr
|
$2,580
-
MMBtu
|
$280
-
Tgal
|
$530 | $1,213 | $76,360 | $675,000 | ||
TOTAL IMPLEMENTED | $682,458 | $54,706 |
$2,730
104,924
kWh
|
$125
-
kW-mo/yr
|
$2,580
-
MMBtu
|
$280
-
Tgal
|
$530 | $1,213 | - | $675,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs