Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,410

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2616 #07 Y:2026 Install waste heat boiler to produce steam $2,606 $11,000
UL2616 #06 Y:2026 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,404 $720
UL2616 #05 Y:2026 Use solar heat to make electricty $29,169 $222,999
UL2616 #04 Y:2026 Install / repair insulation on steam lines $30 $80
UL2616 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,932 $3,420
UL2616 #02 Y:2026 Upgrade conveyors $730 $1,050
UL2616 #01 Y:2026 Close holes and openings in building such as broken windows $3,302 $870
UL2615 #04 Y:2026 Use solar heat to make electricty $33,051 $262,820
UL2615 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,910 $18,224
UL2615 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,206 $1,761
UL2615 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,149 $735
UL2614 #08 Y:2026 Eliminate or reduce compressed air usage $474 $403
UL2614 #07 Y:2026 Use waste heat from hot flue gases to preheat $9,873 $32,500
UL2614 #06 Y:2026 Use solar heat to make electricty $15,669 $220,724
UL2614 #05 Y:2026 Optimize plant power factor $3,431 $7,370
UL2614 #04 Y:2026 Install / repair insulation on steam lines $2,638 $2,392
UL2614 #03 Y:2026 Use outside cold water source as a supply of cooling water $13,075 $57,069
UL2614 #02 Y:2026 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $569 $350
UL2614 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $291 $91
UL2613 #08 Y:2026 Use solar heat to make electricty $29,450 $438,603