Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,293

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2516 #08 Y:2025 Install occupancy sensors $149 $254
UL2516 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $49,312 $34,242
UL2516 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,831 $3,900
UL2516 #05 Y:2025 Use solar heat to make electricty $135,359 $916,268
UL2516 #04 Y:2025 Change rate schedules or other changes in utility service $43,408 -
UL2516 #03 Y:2025 Optimize plant power factor $2,217 $10,400
UL2516 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $15,881 $3,780
UL2516 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $8,018 -
UL2515 #05 Y:2025 Use solar heat to make electricty $22,100 $183,557
UL2515 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $916 $540
UL2515 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $126 -
UL2515 #02 Y:2025 Install occupancy sensors $179 $196
UL2515 #01 Y:2025 Install spectral reflectors / delamp $461 -
UL2514 #05 Y:2025 Ventilation system to shut off when room is not in use $1,193 -
UL2514 #04 Y:2025 Use computer programs to optimize hvac performance $11,076 $19,500
UL2514 #03 Y:2025 Use solar heat to make electricty $11,054 $88,745
UL2514 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,475 $3,938
UL2514 #01 Y:2025 Change rate schedules or other changes in utility service $41,000 -
UL2513 #06 Y:2025 Install occupancy sensors $602 $2,234
UL2513 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,723 $561