ITAC Assessment: UL2615
ITAC logo
ITAC Assessment: UL2615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Manufactured Blocks
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 8
Plant Area 15,686
ft2
Annual Production 4,200,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,450 627,752
kWh
Electricity Fees $8,019 -
Natural Gas $24,822 2,650
MMBtu
Other Gas $3,113 1
MMBtu
TOTAL YEARLY COSTS $117,404
RECOMMENDED SAVINGS* $51,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,149 $525 $3,149
24,281
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,206 $1,761 $1,206
9,300
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,910 $18,224 $13,910
106,998
kWh
04 2.9114: Use solar heat to make electricty $33,051 $262,820 $33,051
254,733
kWh
TOTAL RECOMMENDED $51,316 $283,330 $51,316
395,312
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs