Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0259 #05 Y:2022 Optimize plant power factor $50,082 $26,090
UA0259 #04 Y:2022 Use waste heat to produce steam to drive a steam turbine-generator $225,594 $969,631
UA0259 #03 Y:2022 Recover heat from exhausted steam, hot air or hot water $100,047 $47,295
UA0259 #02 Y:2022 Replace hydraulic / pneumatic equipment with electric equipment $2,057 $2,063
UA0259 #01 Y:2022 Eliminate or reduce compressed air usage $27,827 $1,000
UA0237 #05 Y:2021 Utilize energy-efficient belts and other improved mechanisms $985 $141
UA0237 #04 Y:2021 Reduce space conditioning during non-working hours $12,431 $551
UA0237 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $4,989 $50
UA0237 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $13,075 $9,020
UA0237 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $46,741 $78,276
UA0214 #09 Y:2019 Pay utility bills on time $9,417 -
UA0214 #08 Y:2019 Meter recycled water (to reduce sewer charges) $33,548 $5,698
UA0214 #07 Y:2019 Turn off equipment when not in use $57,024 $7,375
UA0214 #06 Y:2019 Turn off equipment when not in use $58,766 $50
UA0214 #05 Y:2019 Use waste heat from hot flue gases to preheat $13,824 $6,704
UA0214 #04 Y:2019 Replace electrically-operated equipment with fossil fuel equipment $48,099 $7,241
UA0214 #03 Y:2019 Turn off equipment when not in use $22,118 $50
UA0214 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $13,341 $8,495
UA0214 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $21,674 $35,762
UA0213 #06 Y:2019 Use cooling tower or economizer to replace chiller cooling $15,399 $4,370