ITAC Assessment: UA0214
ITAC logo
ITAC Assessment: UA0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Steel Golf Shafts
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 308,711
ft2
Annual Production 7,680,000
units
Production Hrs. Annual 6,336
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $755,098 13,256,158
kWh
Electricity Demand $453,453 38,562
kW-mo/yr
Electricity Fees $101,457 -
Natural Gas $874,526 218,806
MMBtu
Waste Disposal Costs
Water Usage $50,144 13,349,800
Tgal
Water Disposal $47,925 13,350
Tgal
TOTAL YEARLY COSTS $2,282,603
RECOMMENDED SAVINGS* $277,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $185,497

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,674 $35,762 $14,375
252,363
kWh
$5,621
-
kW-mo/yr
$1,678 - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,341 $8,495 $8,792
154,351
kWh
$3,516
-
kW-mo/yr
$1,033 - - -
03 2.6218: Turn off equipment when not in use $22,118 $50 $14,409
252,960
kWh
$5,997
-
kW-mo/yr
$1,712 - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $48,099 $7,241 $28,583
501,811
kWh
$22,812
-
kW-mo/yr
$4,312 $(-7,608.0)
-
MMBtu
- -
05 2.2414: Use waste heat from hot flue gases to preheat $13,824 $6,704 - - - $13,824
-
MMBtu
- -
06 2.6218: Turn off equipment when not in use $58,766 $50 $38,977
684,288
kWh
$15,240
-
kW-mo/yr
$4,549 - - -
07 2.6218: Turn off equipment when not in use $57,024 $7,375 - - - $57,024
-
MMBtu
- -
08 3.4116: Meter recycled water (to reduce sewer charges) $33,548 $5,698 - - - - $33,548
-
Tgal
-
09 2.8123: Pay utility bills on time $9,417 - - - - - - $9,417
TOTAL RECOMMENDED $277,811 $71,375 $105,136
1,845,773
kWh
$53,186
-
kW-mo/yr
$13,284 $63,240
-
MMBtu
$33,548
-
Tgal
$9,417
TOTAL IMPLEMENTED $185,497 $65,627 $66,159
1,161,485
kWh
$37,946
-
kW-mo/yr
$8,735 $63,240
-
MMBtu
- $9,417
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs