| Assessment Year | 2019 |
|---|---|
| Principal Product | Steel Golf Shafts |
| NAICS | 339920: Sporting and Athletic Goods Manufacturing |
| SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
308,711
ft2
|
| Annual Production | 7,680,000
units
|
| Production Hrs. Annual | 6,336
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $755,098 | 13,256,158 |
kWh
|
$0.057 | |
| Electricity Demand | $453,453 | 38,562 |
kW-mo/yr
|
$11.76 | |
| Electricity Fees | $101,457 | - |
|
- | |
| Natural Gas | $874,526 | 218,806 |
MMBtu
|
$4.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $50,144 | 13,349,800 |
Tgal
|
$0.004 | |
| Water Disposal | $47,925 | 13,350 |
Tgal
|
$3.59 | |
| TOTAL YEARLY COSTS | $2,282,603 | ||||
| RECOMMENDED SAVINGS* | $277,811 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $185,497 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,674 | $35,762 |
$14,375
252,363
kWh
|
$5,621
-
kW-mo/yr
|
$1,678 | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,341 | $8,495 |
$8,792
154,351
kWh
|
$3,516
-
kW-mo/yr
|
$1,033 | - | - | - | |
| 03 | 2.6218: Turn off equipment when not in use | $22,118 | $50 |
$14,409
252,960
kWh
|
$5,997
-
kW-mo/yr
|
$1,712 | - | - | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $48,099 | $7,241 |
$28,583
501,811
kWh
|
$22,812
-
kW-mo/yr
|
$4,312 |
$(-7,608.0)
-
MMBtu
|
- | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $13,824 | $6,704 | - | - | - |
$13,824
-
MMBtu
|
- | - | |
| 06 | 2.6218: Turn off equipment when not in use | $58,766 | $50 |
$38,977
684,288
kWh
|
$15,240
-
kW-mo/yr
|
$4,549 | - | - | - | |
| 07 | 2.6218: Turn off equipment when not in use | $57,024 | $7,375 | - | - | - |
$57,024
-
MMBtu
|
- | - | |
| 08 | 3.4116: Meter recycled water (to reduce sewer charges) | $33,548 | $5,698 | - | - | - | - |
$33,548
-
Tgal
|
- | |
| 09 | 2.8123: Pay utility bills on time | $9,417 | - | - | - | - | - | - | $9,417 | |
| TOTAL RECOMMENDED | $277,811 | $71,375 |
$105,136
1,845,773
kWh
|
$53,186
-
kW-mo/yr
|
$13,284 |
$63,240
-
MMBtu
|
$33,548
-
Tgal
|
$9,417 | ||
| TOTAL IMPLEMENTED | $185,497 | $65,627 |
$66,159
1,161,485
kWh
|
$37,946
-
kW-mo/yr
|
$8,735 |
$63,240
-
MMBtu
|
- | $9,417 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs