ITAC Assessment: UA0237
ITAC logo
ITAC Assessment: UA0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Mailboxes
NAICS 332439: Other Metal Container Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 331,793
ft2
Annual Production 4,600,000
units
Production Hrs. Annual 2,660
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,647 2,714,800
kWh
Electricity Demand $131,021 13,102
kW-mo/yr
Electricity Fees $5,807 -
Natural Gas $72,076 15,599
MMBtu
TOTAL YEARLY COSTS $401,551
RECOMMENDED SAVINGS* $78,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $46,741 $78,276 $31,795
448,076
kWh
$14,122
-
kW-mo/yr
$824 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,075 $9,020 $7,661
107,961
kWh
$5,184
-
kW-mo/yr
$230 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,989 $50 $2,801
39,478
kWh
$2,100
-
kW-mo/yr
$88 -
04 2.7224: Reduce space conditioning during non-working hours $12,431 $551 $10,741
151,374
kWh
- $193 $1,497
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $985 $141 $620
8,743
kWh
$349
-
kW-mo/yr
$16 -
TOTAL RECOMMENDED $78,221 $88,038 $53,618
755,632
kWh
$21,755
-
kW-mo/yr
$1,351 $1,497
-
MMBtu
TOTAL IMPLEMENTED $78,221 $88,038 $53,618
755,632
kWh
$21,755
-
kW-mo/yr
$1,351 $1,497
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs