Assessment Year | 2021 |
---|---|
Principal Product | Mailboxes |
NAICS | 332439: Other Metal Container Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $50 M to 100M |
# of Employees | 90 |
Plant Area |
331,793
ft2
|
Annual Production | 4,600,000
units
|
Production Hrs. Annual | 2,660
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $192,647 | 2,714,800 |
kWh
|
$0.071 |
Electricity Demand | $131,021 | 13,102 |
kW-mo/yr
|
$10.00 |
Electricity Fees | $5,807 | - |
|
- |
Natural Gas | $72,076 | 15,599 |
MMBtu
|
$4.62 |
TOTAL YEARLY COSTS | $401,551 | |||
RECOMMENDED SAVINGS* | $78,221 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $78,221 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $46,741 | $78,276 |
$31,795
448,076
kWh
|
$14,122
-
kW-mo/yr
|
$824 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,075 | $9,020 |
$7,661
107,961
kWh
|
$5,184
-
kW-mo/yr
|
$230 | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,989 | $50 |
$2,801
39,478
kWh
|
$2,100
-
kW-mo/yr
|
$88 | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $12,431 | $551 |
$10,741
151,374
kWh
|
- | $193 |
$1,497
-
MMBtu
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $985 | $141 |
$620
8,743
kWh
|
$349
-
kW-mo/yr
|
$16 | - | |
TOTAL RECOMMENDED | $78,221 | $88,038 |
$53,618
755,632
kWh
|
$21,755
-
kW-mo/yr
|
$1,351 |
$1,497
-
MMBtu
|
||
TOTAL IMPLEMENTED | $78,221 | $88,038 |
$53,618
755,632
kWh
|
$21,755
-
kW-mo/yr
|
$1,351 |
$1,497
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs