ITAC Assessment: UA0213
ITAC logo
ITAC Assessment: UA0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Resilient Floor Covering
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 185,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 7,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $895,386 17,294,508
kWh
Electricity Demand $190,735 40,341
kW-mo/yr
Electricity Fees $209,645 -
Natural Gas $208,543 52,862
MMBtu
TOTAL YEARLY COSTS $1,504,309
RECOMMENDED SAVINGS* $76,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,484 $31,859 $16,685
322,288
kWh
$2,162
-
kW-mo/yr
$3,637 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,647 $100 $6,316
121,997
kWh
$932
-
kW-mo/yr
$1,399 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,098 $4,895 $12,444
240,368
kWh
$1,050
-
kW-mo/yr
$2,604 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,549 $1,294 $4,658
89,986
kWh
$1,670
-
kW-mo/yr
$1,221 -
05 2.2414: Use waste heat from hot flue gases to preheat $6,067 $30,000 - - - $6,067
-
MMBtu
06 2.2614: Use cooling tower or economizer to replace chiller cooling $15,399 $4,370 $12,908
249,332
kWh
- $2,491 -
TOTAL RECOMMENDED $76,244 $72,518 $53,011
1,023,971
kWh
$5,814
-
kW-mo/yr
$11,352 $6,067
-
MMBtu
TOTAL IMPLEMENTED $23,647 $6,189 $17,102
330,354
kWh
$2,720
-
kW-mo/yr
$3,825 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs