Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TS0033 #06 Y:1985 Analyze flue gas for proper air/fuel ratio $922 $1,300
TS0033 #05 Y:1985 Install compressor air intakes in coolest locations $1,451 $1,000
TS0033 #04 Y:1985 Reduce illumination to minimum necessary levels $1,601 -
TS0033 #03 Y:1985 Utilize higher efficiency lamps and/or ballasts $1,996 $178
TS0033 #02 Y:1985 Use optimum thickness insulation $1,345 $2,730
TS0033 #01 Y:1985 Insulate bare equipment $13,881 $2,730
TS0026 #04 Y:1985 Use separate switches on perimeter lighting which may be turned off when natural light is available $2,372 $400
TS0026 #03 Y:1985 Utilize higher efficiency lamps and/or ballasts $3,640 $503
TS0026 #02 Y:1985 Insulate bare equipment $325 $460
TS0026 #01 Y:1985 Use demand controller or load shedder $9,637 $3,240
TS0023 #04 Y:1985 Reduce illumination to minimum necessary levels $601 -
TS0023 #03 Y:1985 Eliminate leaks in inert gas and compressed air lines/ valves $928 -
TS0023 #02 Y:1985 Use demand controller or load shedder $3,162 -
TS0023 #01 Y:1985 Optimize plant power factor $1,342 $4,400
TS0018 #03 Y:1984 Improve air circulation with destratification fans / other methods $4,974 $5,200
TS0018 #02 Y:1984 Reduce illumination to minimum necessary levels $11,124 -
TS0018 #01 Y:1984 Use proper thickness of insulation on building envelope $14,252 $23,421
TS0015 #05 Y:1984 Re-use or recycle hot or cold process exhaust air $3,190 $2,100
TS0015 #04 Y:1984 Utilize higher efficiency lamps and/or ballasts $376 -
TS0015 #03 Y:1984 Eliminate leaks in inert gas and compressed air lines/ valves $433 $150