ITAC Assessment: TS0015
ITAC logo
ITAC Assessment: TS0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product GRAY IRON CASTINGS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 145
Plant Area
n/a
Annual Production 20,000
ton
Production Hrs. Annual 4,800
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,686 3,856,389
kWh
Natural Gas $234,769 47,939
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4323: Use optimum size and capacity equipment $7,193 $7,000 - $7,193
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $951 $575 - $951
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $433 $150 $433
9,672
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $376 - $376
8,499
kWh
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $3,190 $2,100 - $3,190
-
MMBtu
TOTAL RECOMMENDED $12,143 $9,825 $809
18,171
kWh
$11,334
-
MMBtu
TOTAL IMPLEMENTED $12,143 $9,825 $809
18,171
kWh
$11,334
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs