Assessment Year | 1994 |
---|---|
Principal Product | Injection molded metal parts |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
40,000
ft2
|
Annual Production | 9,600,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,140 | 5,251,759 |
kWh
|
$0.038 |
Natural Gas | $2,290 | 389 |
MMBtu
|
$5.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,990 | $4,690 |
$2,990
79,719
kWh
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,930 | $2,400 | - | - | $1,930 | |
03 | 2.8121: Apply for tax-free status for energy purchases | $1,860 | $250 | - | - | $1,860 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,630 | $3,840 |
$1,630
43,376
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,150 | $4,660 |
$1,150
30,481
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $910 | $2,080 |
$910
24,326
kWh
|
- | - | |
07 | 2.7261: Install timers and/or thermostats | $460 | $300 |
$290
19,930
kWh
|
$170
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $360 | $610 |
$360
8,499
kWh
|
- | - | |
TOTAL RECOMMENDED | $11,290 | $18,830 |
$7,330
206,331
kWh
|
$170
-
MMBtu
|
$3,790 | ||
TOTAL IMPLEMENTED | $9,780 | $13,560 |
$5,820
167,351
kWh
|
$170
-
MMBtu
|
$3,790 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs