ITAC Assessment: TS0026
ITAC logo
ITAC Assessment: TS0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MOLDED PLASTIC PRODUCTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,327 6,471,864
kWh
Natural Gas $189,449 38,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $9,637 $3,240 $9,637
-
kWh
-
02 2.2511: Insulate bare equipment $325 $460 - $325
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,640 $503 $3,640
53,341
kWh
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,372 $400 $2,372
34,877
kWh
-
TOTAL RECOMMENDED $15,974 $4,603 $15,649
88,218
kWh
$325
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs