ITAC Assessment: NC0022
ITAC logo
ITAC Assessment: NC0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Fabricated wire products
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area 119,000
ft2
Annual Production 62,000
ton
Production Hrs. Annual 6,864
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,899 4,745,604
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,088 $90 $1,088
20,516
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $309 $10 $309
5,862
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,432 $1,592 $1,432
26,964
kWh
04 2.4133: Use most efficient type of electric motors $5,119 $9,280 $5,119
96,424
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $145 $500 $145
2,638
kWh
TOTAL RECOMMENDED $8,093 $11,472 $8,093
152,404
kWh
TOTAL IMPLEMENTED $2,829 $1,692 $2,829
53,342
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs