Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

353

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0023 #03 Y:2024 Install occupancy sensors $1,478 $305
SJ0023 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $848 $2,144
SJ0023 #01 Y:2024 Use solar heat to make electricty $21,134 $146,494
SJ0022 #05 Y:2024 Reduce heat gain by window tinting $367 $2,139
SJ0022 #04 Y:2024 Lower temperature during the winter season and vice-versa $6,671 -
SJ0022 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $213 $179
SJ0022 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $2,205 -
SJ0022 #01 Y:2024 Use solar heat to make electricty $226,672 $1,340,116
SJ0021 #08 Y:2024 Lower temperature during the winter season and vice-versa $4,528 -
SJ0021 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,813 $12,216
SJ0021 #06 Y:2024 Turn off equipment during breaks, reduce operating time $4,438 -
SJ0021 #05 Y:2024 Install occupancy sensors $1,255 $1,308
SJ0021 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,291 $2,078
SJ0021 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $3,040 -
SJ0021 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $493 $109
SJ0021 #01 Y:2024 Use solar heat to make electricty $227,474 $847,735
SJ0020 #08 Y:2024 Replace fossil fuel equipment with electrical equipment $2,868 $15,989
SJ0020 #07 Y:2024 Convert combustion equipment to burn natural gas $2,380 -
SJ0020 #06 Y:2024 Lower temperature during the winter season and vice-versa $2,851 -
SJ0020 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $1,344 -