ITAC Assessment: SJ0022
ITAC logo
ITAC Assessment: SJ0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal fabrication: precision machining, welding, brazing
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 66,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,176 2,111,614
kWh
Electricity Demand $311,309 5,819
kW-mo/yr
Natural Gas $11,974 548
MMBtu
LPG $2,762 38
MMBtu
TOTAL YEARLY COSTS $611,221
RECOMMENDED SAVINGS* $236,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $226,672 $1,340,116 $226,672
1,679,052
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,205 - $1,466
10,857
kWh
$739
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $213 $179 $213
1,574
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $6,671 - - - $6,671
-
MMBtu
05 2.7423: Reduce heat gain by window tinting $367 $2,139 $367
2,716
kWh
- -
TOTAL RECOMMENDED $236,128 $1,342,434 $228,718
1,694,199
kWh
$739
-
kW-mo/yr
$6,671
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs