ITAC Assessment: OK0259
ITAC logo
ITAC Assessment: OK0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product DENIM JEANS
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $50
M
to 100
M
# of Employees 525
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,190 6,439,918
kWh
Natural Gas $113,366 27,217
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,235

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $589 $340 - $589
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,675 $37,500 $20,145
443,728
kWh
- $4,530
03 2.7261: Install timers and/or thermostats $5,646 $900 - $5,646
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $2,333 $1,490 - $2,333
-
MMBtu
-
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,873 - $5,873
135,991
kWh
- -
06 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $7,709 $6,300 $7,709
177,902
kWh
- -
TOTAL RECOMMENDED $46,825 $46,530 $33,727
757,621
kWh
$8,568
-
MMBtu
$4,530
TOTAL IMPLEMENTED $6,235 $1,240 - $6,235
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs