ITAC Assessment: SJ0021
ITAC logo
ITAC Assessment: SJ0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Machined Components; Weldments
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 60,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $434,466 1,532,665
kWh
Electricity Demand $76,966 4,126
kW-mo/yr
Natural Gas $7,338 294
MMBtu
TOTAL YEARLY COSTS $518,770
RECOMMENDED SAVINGS* $252,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $227,474 $847,735 $215,894
761,609
kWh
$11,580
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $493 $109 $493
1,738
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,040 - $3,040
10,726
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,291 $2,078 $930
3,282
kWh
$361
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,255 $1,308 $1,065
3,757
kWh
$190
-
kW-mo/yr
-
06 2.6212: Turn off equipment during breaks, reduce operating time $4,438 - $4,438
15,656
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,813 $12,216 $9,188
32,412
kWh
$625
-
kW-mo/yr
-
08 2.7221: Lower temperature during the winter season and vice-versa $4,528 - - - $4,528
-
MMBtu
TOTAL RECOMMENDED $252,332 $863,446 $235,048
829,180
kWh
$12,756
-
kW-mo/yr
$4,528
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs