ITAC Assessment: SJ0023
ITAC logo
ITAC Assessment: SJ0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Precious metal plating, Alumina metallization and Brazing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 22
Plant Area 15,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,357 467,328
kWh
Electricity Demand $21,985 2,263
kW-mo/yr
Natural Gas $15,185 725
MMBtu
Waste Disposal Costs
Water Usage $3,112 130
Tgal
TOTAL YEARLY COSTS $104,639
RECOMMENDED SAVINGS* $31,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $21,134 $146,494 $21,134
153,465
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $848 $2,144 $631
4,584
kWh
$217
-
kW-mo/yr
03 2.7135: Install occupancy sensors $1,478 $305 $1,478
10,780
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,823 $2,466 $1,823
13,208
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,164 $1,874 $3,164
22,930
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,625 - $2,625
19,024
kWh
-
07 2.2511: Insulate bare equipment $190 $380 $190
1,379
kWh
-
TOTAL RECOMMENDED $31,262 $153,663 $31,045
225,370
kWh
$217
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs