| Assessment Year | 2024 |
|---|---|
| Principal Product | Precious metal plating, Alumina metallization and Brazing |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $5 M to 10M |
| # of Employees | 22 |
| Plant Area |
15,000
ft2
|
| Annual Production | 200,000
units
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $64,357 | 467,328 |
kWh
|
$0.14 | |
| Electricity Demand | $21,985 | 2,263 |
kW-mo/yr
|
$9.71 | |
| Natural Gas | $15,185 | 725 |
MMBtu
|
$20.94 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,112 | 130 |
Tgal
|
$23.94 | |
| TOTAL YEARLY COSTS | $104,639 | ||||
| RECOMMENDED SAVINGS* | $31,262 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $21,134 | $146,494 |
$21,134
153,465
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $848 | $2,144 |
$631
4,584
kWh
|
$217
-
kW-mo/yr
|
|
| 03 | 2.7135: Install occupancy sensors | $1,478 | $305 |
$1,478
10,780
kWh
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,823 | $2,466 |
$1,823
13,208
kWh
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,164 | $1,874 |
$3,164
22,930
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,625 | - |
$2,625
19,024
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $190 | $380 |
$190
1,379
kWh
|
- | |
| TOTAL RECOMMENDED | $31,262 | $153,663 |
$31,045
225,370
kWh
|
$217
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs